Occitanie Tower, Toulouse
[Image © MORPH]
In March 2017, Studio Libeskind revealed their designs for a new high-rise building for the heart of the business sector of Toulouse, France. The sculpted Occitanie Tower will rise 150 m above the Canal du Midi, and is set to be the first skyscraper in the city.
[Image © Luxigon]
Integrated into the overall form of the building, the façade and public platform is a continuous vertical landscape. The platform of the building with be lined with trees, while a ribbon of gardens will curl around the glass facade to its full height. The vertical gardens will be designed by andscape architect Nicolas Gilsoul.
The tower includes 11,000 sq. m of office space, a Hilton hotel, up to 120 apartments, a restaurant with panoramic views, commercial space for shops, and offices on the ground floor for railway company SNCF.
Situated to the east of the city centre, away from the Garonne River, the building will have views towards the Pyrenees, that are less than 100 km away. The project will become the gateway to the city’s growing business sector.
[Image © Luxigon]
Daniel Libeskind said:
“With its suspended gardens that change color during the seasons, the slight silvertine of the glazing of the façade will reflect the pink tones of Toulouse and the brightness of this material will change perception of the space, according to the variation of light.
“The tower becomes a unique object in a vast urban space – the tower will not only become a destination, but also a defining public space.”
Studio Libeskind will collaborate with Toulouse architect Francis Cardete. Construction is expected to start in 2018, with a project completion date of 2022.
Content and images courtesy of Studio Libeskind.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.